深圳市重硕电子科技有限公司 Longhua District, Shenzhen, China
TEL 86-0755-21034652 FAX 86-0755-21034652 Est. 2016-07-29

Technical guides & industry notes

Seven evergreen articles on how boards are designed, quoted, built and inspected. None of them report a company event — they explain the engineering behind the price.

02Index

Guides, trends and working notes

Every article below is a working note rather than a report. Filter by category, or read the full text.

Engineers reviewing PCB design data on screen
Company Note

What happens between your Gerber files and a shipped board

The route every order takes: inquiry, DFM review, itemised quotation, written specification, production, inspection and the documentation that ships with the boards. Knowing the steps tells you exactly what we need from you at each point.

Heavy-copper multi-layer PCB with plated through holes
Industry Note

Why layer count is the single biggest driver of PCB cost

Extra layers change the build route, not just the material bill: lamination cycles, thicker plating, longer drilling and test time, and a yield curve that steepens with every added layer. Here is where the money actually goes.

Panelised multi-layer PCB array
Technical Guide

How layer count actually changes the price of a PCB

A working method for estimating what a layer count will cost you: which line items scale with layers, which scale with area, and how to test whether your design can drop a layer before you order one.

Inspection of a bare board under magnification
Technical Guide

Eight DFM checks that prevent the most expensive rework

Annular ring, aspect ratio, copper balance, mask dam, creepage, outline and test access: the manufacturability checks worth running on the Gerbers before anything is cut, and the ones that still get missed.

Compact board with machined cut-outs
Technical Guide

Rigid-flex or HDI: choosing a structure for a compact device

Two routes to the same thin envelope: a bendable flex section that removes the connector, or a denser interconnect stack that removes the area. The cost, yield and reliability trade-offs differ in kind, not just in price.

Start a conversation

Send us the files, not a vague description

Gerbers, a stack-up, or just the question you are stuck on. We answer inquiries during Monday to Saturday, 9:00–18:30 (GMT+8).

Call